Website 3.0 Migration Plan

From CCCWiki
Revision as of 07:55, 27 May 2015 by Marc.maier (talk | contribs)
Jump to: navigation, search

Strategy

In order to make sure that we can prepare and test the website in the best way possible, we will refresh the test website from the production website every two weeks. In order for this to be viable we will impose a freeze on every major changes from the start to the project and impose a freeze on production changes from two weeks before launch.

Manual Steps

The following steps will need to be executed manually as part of the migration:

  • Go to Content > Article Manager > Options and set Linked Titles to No
  • Go to Extentions > Module Manager > Options and set the positions for Search and Smart Search to head-search